The works consist of carrying out maintenance painting to the underside of SPANS 3 and 4 ONLY (below the parapet) of the structure. The works will have a manned external personnel security guard on-site 24/7 which will need to be set up within the works cabins so TV's and equipment can be set up on a separate desk for them to work from. This will also include installing 3No. live cameras monitoring the scaffolding throughout the works 7 days a week. Both sides of the bridge to be covered by CCTV. Regular walk inspections are also to be carried out.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| C R Reynolds Limited | 01772107 | £800,000 | - |