This project is a technology agnostic high-level study of the costs, risks and opportunities for different cable topology and cable connection methods (including subsea wet mate connectors) for offshore floating wind, in comparison to a more conventional topology in a daisy chain configuration between turbines. This study is important as it aims to answer the following questions:
⢠What topologies will potentially be used for future FOW sites (e.g. daisy chain, fishbone, or star)?
⢠What type of connectors will be required and their current technology readiness level (TRL) in the subsea sector (i.e. what is going to be available in 2025 to 2030)?
⢠What are the expected failure modes and reliability level of cable array topologies using subsea connectors versus conventional daisy chain arrangements? How does this influence the overall array-level system reliability and redundancy?
⢠What are the installation characteristics of the comparative array topologies for installation and disconnection (i.e. required vessels and equipment, time scales, any additional risks and uncertainties)?
⢠What are the comparative purchase, installation and O&M costs for different connector and topology combinations?
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| DNV UK LIMITED | 09208322 | £35,240 | LOBBYIST Policy Connect Limited (7 quarters) Whitehouse Communications Limited (1 quarter) |
Government spending data: This supplier has received £262,643 in 4 payments (over £25k) from Ministry of Defence (2021-02-01 to 2021-05-05). View full payment history →