BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 5 km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.
EKFB are looking for a competent contractor to provide the mechanical heat recovery system.
The system is designed to provide constant background ventilation through mechanical heat recovery, ensuring efficient operation and energy savings. The system is controlled and monitored via the Building Management System (BMS) and includes local control options
No supplier information available.