The existing gas central heating boiler and associated plant and equipment is located within the basement of building 18 which requires full replacement due nearing end of expected life.
The scope will comprise of the safe isolation of gas and electrical supplies, followed by the strip out, removal and disposal of all of the existing boiler plant and equipment, hot water cylinder, auxiliary equipment and accessories housed within the basement in building 18.
Part of the package will be to include engagement with a licensed asbestos removal contractor to remove all asbestos containing material from the basement boiler room.
Design, supply and install new boiler and water cylinder arrangement within the building's old kitchen room on ground floor. The new system is to serve the existing open vented heating system inclusive of all new gas pipework, modifications, compliant flue arrangement and open protocol BMS system.
Final testing and commissioning inclusive of functional demonstration and operation training.
Handover documentation inclusive of operation and maintenance manuals, drawings, schematics, warranties and compliance certificates.