At present on site there is an old skate park that consists of a variety of verts, volcano, jump box and street style equipment which is now nearing the end of its life and we wish to replace with a new concrete skate park.
The budget for this new facility is a maximum of £80,000 and this will need to include all the requirements below.
We appreciate that £80,000 may not be enough to replace all of the ramps and therefore would be looking at a two phase project on this site. This would mean that in phase 1 we look at replacing the metal " Wembley gap/quarter pipe/mini ramp" the small combination box and possible one of the quarter pipes that all run down one half of the site. This would leave the other half with its tarmac pad and ramps for phase 2 when funding is available so will mean that any new design for phase 1 must flow to the usage of what old ramps remain.
No supplier information available.