The Works comprise opening up of construction elements at various locations to enable AECOM to verify and confirm the form of construction at each point, against the designed and as-built information. The contractor will be responsible for making safe and reinstating all opening up works prior to the school re-occupation.
Completed tender submission documents to be returned as per the instructed contained within the Preambles document.