BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Recommission an existing Solar Thermal heat recovery system based at Tavistock Place, London.
There are three existing Domestic Hot Water (DHW) Storage Cylinders (total capacity 2.4m³) located within one of the basement plantrooms that are to be reused following inspection and possible internal descaling.
The existing DHW pre-heat Storage Cylinder is to be converted to a Thermal Store that shall primarily supply thermal heat from the proposed recommissioned Solar Thermal heat recovery system at a storage temperature ceiling of nominally 65°C to be then transferred on demand indirectly to the remaining two DHW Storage Cylinders as a priority heat supply source and independently of the existing NG Boiler(s).
The existing NG fired Boiler(s) shall be configured to augment any remaining DHW thermal heat requirements in order to meet the combined delivery temperature of DHW outside of the useful prioritisation of the Solar Thermal heat recovery system.
It is proposed to reconfigure the existing primary hydraulic heating and DHW supply to the deployed three DHW Storage Cylinders.
Further information found within the ITT documentation on the Bravo Solutions portal.
Additional information:
To access the Invitation to Tender for this project you will first need to register with the LSHTM eTendering Portal.
https://lupc.bravosolution.co.uk/web/login.shtml
Once you have registered, you can access the current opportunities, to find the ITT documentation.â¯
No supplier information available.