Full refurbishment of the existing car park including;
a.Breaking out existing surfacing b.Removal of existing ramped bund c.New DBM surfacing to sections d.Cellular block (grassed) paving to sections of the site e.Various kerbs, islands and edgings f.Low level post and rail fencing g.New bollards and timber posts
â¢Construction of new concrete steps to sea wall
â¢Signage
â¢Decoration of barriers etc
â¢Solar powered lighting
â¢Solar powered Electric vehicle charging points
As fully detailed in the Specification and Schedule of Works.
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.