There is a requirement for a skid mounted air-cooled chiller and control equipment inclusive of the design, manufacture, inspection, works testing, delivery to site, installation and setting to work. This packaged unit will replace two existing chillers which were installed in 2012. The existing chillers have a cooling capacity of c. 35kW (each unit). The removal and disposal of existing equipment will form part of this requirement.
This RFQ is seeking a single source arrangement with the successful tenderer whom will be required to provide all necessary equipment, labour, materials and plant for the supply, the scope of which is further detailed in the procurement documentation.