This contract involves the design and build of a pedestrian Bridge and adjoining footpaths (using the attached outline designs as a baseline) crossing Hobson's Conduit in a location off Kingfisher Way roughly between the buildings known as the Oak and the Steel Buildings. The project has Full Planning Permission for the bridge at the location shown in the project drawings.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| TopBond plc | 01204146 | £50,000 | - |