As a part of futureproofing and improving the tank overfill protection at Loch Striven, it is required to replace the tank-side issue & receipt manual gate valves with an actuated valve, replace the 6" and 4"tankside valves and complete some platform modification works to enhance the practicality of operating the asset. Please refer to the details of the scope of work for the installation of tank side valve and associated access platforms in the valve chamber of T9 and T11 at OFD Loch Striven.
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| D M Fabrication Ltd | - | £41,956 | - |