NCC are seeking to further investigate the opportunities presented by heat from mine water in Blyth and from CHP in Cramlington through two separate techno-economical feasibility studies.
This requirement is split into two lots as follows:
Lot 1 - Blyth
Lot 2 - Cramlington
Suppliers may bid for either lot or both.