The provision and installation of a new cold water storage tank and booster set within the old laundry room at Haynes House, Staple Hill, Bristol. Works to include excavation and install of a new mains cold water feed to the storage tank, domestic and commercial plumbing works, installation of a new 2000L water tank and mechanical electrical works for the booster set and provision of power. Haynes House is a block of flats situated in the Staple Hill area of Bristol. The block consists of 49 individual flats which are heated via a district heating system. The block has suffered from low pressure during peak times of use which can result in some of the top floor flats having no cold water supply.