BRIEFLY THE PROJECT SCOPE IS TO CARRY OUT FLOOD CONTROL MEASURES TO PREVENT FUTURE FLOODING OF THE SEWAGE TREATMENT PLANT OF EPISKOPI STATION, WHICH IS LOCATED IN HAPPY VALLEY AREA. THESE MEASURES CONSIST OF THE FOLLOWING WORKS:
o THE CONSTRUCTION OF A RETAINING WALL 140 METERS LONG. THE PROPOSED WALL WILL HAVE A HEIGHT OF 1.50 METERS FOR THE FIRST 45.00 METERS AND A HEIGHT OF 2.00 METERS FOR THE REMAINING 85.00 METERS. THE CHANNEL WIDTH MUST BE MINIMUM 7.00 METERS FOR THE FIRST 55.00 M AND 4.00 M FOR THE REMAINING 85.00 M. THE WALL WILL HAVE ONE-METER FOUNDATION IMMERSED IN THE GROUND FOR EROSION PROTECTION PURPOSES. THE RIVERBED AT THE WHOLE LENGTH OF THE 140 METERS, WILL BE FORMATTED TO ALLOW THE SMOOTH FLOW OF STORM WATER.
o THE CONSTRUCTION OF A CHECK DAM UPSTREAM OF THE ROAD CULVERT USING GABIONS TO ACT AS A PHYSICAL BARRIER. THE LOCATION OF THE PROPOSED CHECK DAM IS ABOUT 60 METERS UPSTREAM OF THE MAIN ROAD. THE CHECK DAM WILL BE CONSTRUCTED USING GABIONS IN ACCORDANCE WITH DESIGN DRAWINGS.
o THE CONSTRUCTION OF A NEW CULVERT THROUGH THE HORSE STABLES, THAT WILL PREVENT FLOODING WITHIN THE STABLE FACILITIES. THE PROPOSED CULVERT WILL HAVE A DIAMETER OF 0.80 METER AND A LENGTH OF 50 METERS.
Access to HSW areas have several restrictions that should be complied with as follows:
The Provisional Key Tender dates for the project are as follows:
The currency of this project is Euro (â¬).
The location of this project is Cyprus (British Forces, EPISKOPI).
THE PROJECT SITE LOCATIONS ARE:
Additional information:
WORK COMMENCEMENT AND COMPLETION DATES WILL BE SUBJECT TO MOD DIO'S AGREEMENT, AS THEY WILL BE DICTATED BY THE OPERATING AUTHORITY TO AVOID OPERATIONAL RESTRICTIONS.