Survey, Design & Installation of Ship Hall
Building 1/122 Ship Hall B was built in 2003. The north elevation has a large opening
(circa 47.1 m x 32.3 m) completed by two vertical lift fabric doors, separated by a removeable central mullion. Both doors and mullion are in a poor material condition after 20 years, and the right-hand door (viewed from external) was damaged during a storm in November 2024. The aim of this project is to replace the doors and associated equipment.
The contractor shall quote for two options:
(a) A wall to close the opening.
(b) A door system to fill the opening but also allow unobstructed access into
Ship Hall B when open.
The project will be delivered in three work packages:
The contractor shall develop a fully detailed and construction-ready design package that includes technical drawings, installation methodologies, and a comprehensive compliance plan to ensure all regulatory requirements are met. The design shall demonstrate a clear path for commissioning, testing, and integration with other systems.