BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Merseytravel are looking to put a contract in place for the purpose of replacing Variable Speed Drives (VSD) along with associated equipment and cables for schemes and works across 2 sites on the Merseytravel estate, namely Georges Dock and North John Street ventilation stations. Merseytravel are looking to appoint a Contractor to carry out the supply and installation of VSDs along with the removal and safe disposal of the redundant units. Primarily for the replacement of existing FKI drives in the ventilation stations and replace the cables from the VSD to the fan motors, and associated control cables.
No supplier information available.