To equip and carry out alterations to an existing workshop at the GL4 6PG depot to maintain the Gloucester City vehicle fleet in a modern, effective and efficient way.
The main bulk of the works will be to:
⢠supply and installation of a new 10 metre vehicle inspection pit;
⢠supply and installation of an approved ATF 20 tonne air operated pit jack;
⢠supply and installation of a commercial ATF approved 20 tonne commercial play detectors with remote wireless handset;
⢠supply and installation of an ATF approved commercial vehicle roller brake tester (RBT) complete with hard standing testing area within 5% of level on approach to the RBT for 11 metres, including extending outside the building as necessary;
⢠supply and installation of 6 wireless mobile column lifts (SWL 7,5T each lift);
⢠Axle Stands for column lifts (SWL 7.5T);
⢠supply and installation of 4 tonne two post vehicle lift;
⢠supply and installation ATF approved commercial vehicle headlamp aligner with hard standing testing area within 5% of level, for a distance of at least 8.5 metres;
⢠supply and installation 100 litre oil drainer;
⢠Miscellaneous as per specification and pricing spreadsheet.
Additional information:
Documentation may be obtained at: https://www.supplyingthesouthwest.org.uk
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Gemco UK Ltd | 03514486 | £140,000 | - |