The project involves groundworks in 8 no. areas totalling 167m2 (with an additional provisional area of 87m2) involving the excavation of the road surface and sub-surface to the required depth, laying Terram, a Tesar Triax Geogrid, a 150mm layer of compacted Type 1 MOT, a 90mm base layer, a 60mm binding layer, followed by laying a 45mm surface layer.