The three Mirrlees Blackstone engines (ESL16 twin bank engine) installed at Thames Barrier are fast approaching their anticipated three- quarter life survey . The following inspections and component overhaul are proposed , in order to enable the engines to be suitable for a further 10-15-year period.
1. Nodal Damper Coupling (NDC) fluid level check
2. Gearbox bearing and final alignment verification
3. Cylinder Liner Nose O-ring Renewal
4. Liner deglazing and Piston Ring Pack replacement
5. Cylinder Head Decarbonising and Pressure Test
6. Jacket Water Pump.
7. Standard Service Procedures
Within procedures 1 - 6 carry out standard service work to include:
8. Recalibration of on engine sensors
9. Re-commissioning / load test
The engineer/s working on the project must have in-depth knowledge of ESL 16 twin bank engines, with proven evidence of experience. The successful supplier will provide spares when required, within a reasonable lead time.
The preferred supplier must be CTC (counter terrorist check) cleared prior to contract award.