This requirement if for the supply and installation of a Bradbury H4443 wheel free 4 post lift. This is a specific model that is required so that it will fit within the existing footprint and work space.
The lift will be required to be supplied and installed within the Channel Tunnel site in Coquelles, France.
Before installation, the existing Bradbury 40 series 4 post lift will need dismantling/ uninstalling.
All quotes are requested include and itemise:
The quote is not required to include:
Both of the above requirements are expected to be provided by the port operator.
Please provide a clear indication of lead times and timescales within your quotation.
Additional information: Any questions, queries or clarifications regarding the quotations should be e-mailed to: …@homeoffice.gov.uk by 16:00 Tuesday 18th August 2020 at the latest.
All quotations should be submitted via e-mail to …@homeoffice.gov.uk by 16:00 on the 19th August 2020 at the latest.
All quotations that meet the requirements within the description will be considered.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Huttie | - | £16,600 | - |