The Sport Centre has a 25 x 12 metre pool, currently running off two large filters that are located in the lower plant room, classified as a medium risk confined space. There is also a Sap pool running off one filter that is located in the upper-level plant room.
The requirements are the removal, supply and fit of new medium rate nozzle plate filters for the main pool and a new high-rate nozzle plate filter for the Spa pool.
The filters should be piped up to existing pumps and all valves and associated pipework will need to be replaced.
The works are required to be done with a short turnaround, to be completed by 31st July 2024, with little to no disruption.
For full tender information and to express an interest please visit our InTend portal via https://in-tendhost.co.uk/salford/aspx/Home.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Pool Technical Services Ltd | 07967122 | £148,768 | - |