The 1st access route in the park & ride is in a poor state with the existing grass reinforcement grids lifting up, becoming uneven and making the area unsafe to drive and walk on. The existing grids will be replaced with a heavy duty paving system that can withstand the volume of traffic using the route. To enable the works there will also be some excavation works involved as well as importing and laying type 3 stone and to finish topsoil/grass seed.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| C R Reynolds Ltd | 01772107 | £197,929 | - |