Culham Science Park's control and server rooms provide computing, data and control functions across the whole site. The Works required are the Design, Supply, Construction, Refurbishment and Commissioning of the entire HVAC system based on the enclosed Stage 4 specification. This requires reconfiguration of the existing large air handling unit to serve the control room and offices, reducing its capacity, whilst providing new Computer Room Air Conditioning close control systems for the server room.