Stem Architects Ltd on behalf of Yorkshire Ambulance Trust produced and issued a tender package and following competition the contract was awarded for the mezzanine floor works required at Hull Hub site, 3 Sissons Way, Hull, HU5 1AL
Kole Architects are instructed as Principal Contractor to deliver the remedial and enabling works required to the existing building at Hull. Under a PC North Lincs Structures Ltd will deliver the mezzanine floor package, working as a sub contractor to Kole Architects, under the CDM regulations.
Additional information:
Principal Contractor Stanwayn T/a Kole Architects
Sub Contractor North Lincs Structures Ltd
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Stanwayn Limited | 07679371 | £490,589 | - |