Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts for the Area North project in the West Midlands.
We are looking to engage with the steel fabricators in the supply chain whom provide Fabrication drawings and the ability to manufacture steel capping beams for concreting works.
Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
When selecting a supplier BBV look for alignment of values, behaviors and cultures, between ourselves and our supply chain. BBV and HS2 have aligned their values to the following:
In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include:
Successfully shortlisted supplier's will be those with verifiable experience, and the appropriate capacity ,resources and technical ability to deliver the scope of works. Supplier's may then be invited to the project, to formally demonstrate their experience and capabilities. As an alternative phone/webinar interviews may be conducted.
On selection, shortlisted supplier's will be issued with a formal pre-qualification and/or Invitation to Tender (ITT) to demonstrate their ability to work with these values and behaviors in mind, whilst proving their demonstration of capabilities and competence.
BBV is a joint venture between Balfour Beatty Group and VINCI Group. Balfour Beatty VINCI is a long established joint venture between two global leaders in the delivery of critical Infrastructure and Highways Projects, such as the channel tunnel, crossrail, M4/M5/M6 Smart Motorway projects and HS2 main works civil contract for the north.
More about BBV:
For more information please visit our website www.balfourbeattyvinci.co.uk
Please see attached drawing showing cast in items (highlighted orange, blue and green) that require procurement for the Retained Cut Capping Beams.
We will require 1no. "set" at each end of the 22no. precast props, therefore 44no. "sets" in total.
Shop/fabrication drawing(s) will need to be produced and issued for approval to ensure detailing is correct.
We will require all 44no. "sets" delivered to WWH no later than 1st Aug 2022.
Additional information: Please see attached drawing showing cast in items (highlighted orange, blue and green) that require procurement for the Retained Cut Capping Beams.
We will require 1no. "set" at each end of the 22no. precast props, therefore 44no. "sets" in total.
Shop/fabrication drawing(s) will need to be produced and issued for approval to ensure detailing is correct.
We will require all 44no. "sets" delivered to WWH no later than 1st Aug 2022.