BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
We would like to remodel the study room at the Central Library with the main aim being to increase the number of shelving units in the area without losing the current number of study spaces, PC stations, copying and self -service machine.
The room is currently used mainly as a study space for students with the area in the middle being a flexible space so that we can hold events such as film screenings etc, We would like to maintain this; however, we need to increase the number of shelves in the room by at least 50% to meet service changes.
The library is grade II* listed so there are limited number of electrical sockets in the room (around the pillars).
Could you design a new layout for the room and price the additional furniture individually so that we can select items accordingly to match our allocated budget. The existing furniture can used in the design if required.
Attached is a floor plan showing current layout of the room, a first-floor plan of the central library and photographs.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| FG Library Products Ltd | 04082871 | £28,489 | - |
Government spending data: This supplier has received £44,887 in 4 payments (over £25k) from Met Office (2024-01-11 to 2024-09-18). View full payment history →