South Tees Development Corporation are seeking the Design, Installation and Commissioning of 66/11k V transformers at two separate locations on the Redcar Site.
Lot 1: South Bank Substation and Cabling
Lot 2: seAH Substation and Cabling
Lot 1: South Bank - To install two new 35/50MVA 66/11kV transformers at a location outside the client plot boundary to replace T67 and T68. Alongside that, both the 66kV transformer supply cables and the primary 11kV switchboard (Holmebeck 11kV) supplied by the transformers are over 50 years old. The cables and switchboard will also be replaced.
Lot 2: seAH - To install two new 35/50MVA 66/11kV transformers alongside a primary 11kV switchboard supplied by the transformers. This will be located in a compound on the perimeter of the client site boundary
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| ELECTRICITY NORTH WEST (CONSTRUCTION AND MAINTENANCE) LIMITED | 07382637 | £6,000,000 | - |