Loading contract…
BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
1. The replacement of 15No. existing external timber doors and frames (mixture of single and double) with aluminium doors and frames.
2. The alteration of existing surface water drainage to the rear external ramp area, including making an underground connection into the existing site surface water drainage system and the replacement of rainwater goods.
3. The replacement of rainwater goods to both sides of the Assembly Hall pitched roof, with termination into the existing rainwater gullies.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Lancer Scott Ltd | 13348902 | £68,043 | - |