Following a fire door inspection completed to LPS1197 third party accredited standards, we require a fire door accredited contractor to carryout repairs/replacements as per the findings from the inspection, completed Aug 2023. All quoted replacement doors & remediation works is to be completed to LPS 1197 and LPS1271 accredited standards.
A site survey is recommended, these can be accommodated week commencing 13th November 2023.
Prior to any works commencing the Principal contractor will provide a Construction Phase Plan (CPP) in writing, to be checked and approved by the Defra Principal Designer at least 10 days prior to proposed construction works starting.
Site specific Risk Assessments and Method Statements (RAMS), which take into account task risks and site related risks, including those identified by the DEFRA Client and the Principal Designer.
All work carried out by the contractor should comply with the DEFRA approved code of practice with regards to health, safety and wellbeing.
Site Manager to have SMSTS accreditation (or equivalent) and site supervisors to have SSSTS accreditation.
All waste must be removed from site by the contractor. All areas must be made good upon completion, to include frame, paint work and flooring.
Supporting document include Fire Inspection Report, Site Compartment Drawings.