BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The UoN is not a contracting authority for the purposes of the Public Contracts Regulations 2015 (as amended) and its procurement activities are not subject to the Public Contracts Regulations 2015.
Synopsis: Primary contractor required to carry out Roof Renewal Works at the South Labs and The Boiler House Buildings including:
o Remove all existing waterproofing, insulation, and any Air & Vapour Control Layers from all perimeter upstands and detailing to abutment upstands and vertical skirtings.
o Blisters / Detached bitumen membrane: Repair, re-adhere and protect with additional layer of matching bitumen membrane if necessary.
o All new materials and accessories: Must be compatible with existing. Some brands & materials to be specified o Renewing roof as specified including: Preliminary work including formation of abutment upstands, kerbs, box gutters, sumps, grooves, chases and expansion joints.
o Fixing of battens, fillets and anchoring plugs/strips as required.
o Thorough Priming o Applying new underlayer, capping sheets, upstands and detailing in line with the specification.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Allsopp Construction Ltd | 07834548 | £679,000 | - |