BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
This scheme consists of excavating out a section of grassed area to a depth 450mm and replacing with 250mm thick Type 1 Sub base, 70mm Asphalt Binder course and 30mm Close graded surface course to provide a new parking area. The existing carriageway shall also be widened by 2.5m to allow for parking along the northside of Northway, Goole
Some replacing/adjusting of existing ironworks will be carried out along with some new kerbing and lining will be installed. A new footway will be constructed, excavating to a depth of 170mm and replacing with 100mm Sub base material, 50mm Asphalt concrete binder course and 20mm Asphalt concrete surface course.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Wright Civil Engineering Ltd | 01682425 | £76,192 | - |