BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The council requires a single supplier to provide structural and civil engineering maintenance and repair works to tenanted low rise properties which are managed by NPS Norwich Ltd.
Replacement staircases and repair works are required to the 3-storey building block of parades on Drayton Road and Colman Road made up of a ground floor shop and maisonette.
UPDATE DECEMBER2021 - Project was put on hold due to Covid19 and the Leasehold consultation process. Was taken off hold in October 2021. The winning supplier advised there had been an uplift in costs due to material increases but uplift was still below the other bids so the council have not been required to re-award. Project will now commence on site May2022 with fabrication of staircases to start from Jan22.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Bawburgh Installations Limited | 06003027 | £279,675 | - |