BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The works comprise the supply, installation, testing, commissioning and set to work in full the Replacement of Visitor's Centre Oil Fired Boiler Plant South site of The Imperial War Museum site near Duxford Cambs.
In addition, some alteration to the fencing around redundant oil tank enclosure, removal of existing bases and formation of new concrete bases for the ASHPs, new equipment, pipework, insulation, electrical power & controls etc
Removal and proper disposal of redundant equipment & pipework etc as described
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
No supplier information available.