Fixed Fee Quote
LPC request a price to implement all of the work as detailed within the Tender Document and on the included plans to include:
Construction of car park through provision of stone and tarmac as referenced, dished channels, bull nosed kerbs, removal of bunds where annotated, provision of knee rail fencing as indicated and connection of the surface water run off to the 3 x drainage pipes in situ. The price should allow for any excess soil or spoil to be removed from site.
LPC does not expect any existing stone to be removed, and the levels shown on the existing plan are as they were measured in 2022. Due to issues with flooding, some bunds (that are not referenced) have been removed and replaced with stone to a similar level of those quoted - but there may be some small discrepancies.
Contingency plan
LPC is conscious that in the past few years, construction costs (including materials) has become volatile and prices have, in certain instances, grown substantially.
For this reason, LPC needs to consider that the works may need to be reduced and to that effect, a lesser specification may be proposed based on the attached plans within the Tender Document.