Call off via WECA Professional Services Framework - DN415582\r
\r
The bridge over Brunel Dam previously had a 3t weight limit. This bridge was strengthened in\r
2009, as part of the works to Entrance Lock. However, the information of the new weight limit\r is unknown. A bridge assessment is therefore required. Due to a lack of information on the bridge, this needed to be done over two phases. Following Phase 1, we can now move to conducting an assessment on the bridge. This will be for normal traffic and two specific heavy vehicles.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| WSP Development & Transportation | - | £33,350 | - |