This project covers the replacement of the existing lighting and emergency lighting in all internal areas of Clifton Sports Hub. The base lighting will be replaced with Dextra fittings complete with a new Casambi control system (sensor within every fitting). The emergency lighting will be replaced with a standalone Thorlux Smart Scan System. The existing control system will be stripped out. system.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| europa electrical ltd | 02473116 | £256,000 | - |