Specification for Authority
The works consist of replacing the existing boiler, flue, pumps, controls and associated equipment. To enable new boiler plant to be installed, existing equipment shall be stripped out as shown and described in this document and on the drawings. The existing boiler plant must remain in operation throughout the works until the final switch over. The main contractor shall be the mechanical contractor and should allow for all works necessary to complete the project, including builders work, electrical works, any structural input required, approvals, issuing of all necessary documentation and notifications.
In addition to the new boiler plant, electric water heaters shall be installed, and the existing centralised hot water system stripped out/back. All works are described on the drawings and within the specifications.
Additional information:
Expression of interest and tender documents via the University of Sunderland E-Portal.
https://in-tendhost.co.uk/universityofsunderland/aspx/Home
Is a Recurrent Procurement Type? : No