The current drainage system around the pond is failing due to the gullies filling with debris and vegetation resulting in the gullies not allowing flow of water through.
Works will include coring/ drilling eight holes to improve the drainage.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| PBS CONSTRUCTION (NORTH EAST) LIMITED | 02266573 | £21,342 | - |