BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
2. The Requirement
Guy's and St Thomas's NHS Trust is looking for quotations for equipment maintenance for Contrast Injectors & Rapid Infusors manufactured by Medrad Uk.
3. Contract Period
The contract is required to start on [Start Date Column R] and is to run for a period of 12 months.
4. Equipment to be Covered
Serial Number Device Model Manufacturer
200770 Contrast Injectors & Rapid Infusors SGII Solaris Injection System MEDRAD UK
201481 Contrast Injectors & Rapid Infusors SGII Solaris Injection System MEDRAD UK
200769 Contrast Injectors & Rapid Infusors SGII Solaris Injection System MEDRAD UK
46114 Contrast Injectors & Rapid Infusors SPECTRIS SOLARIS EP MEDRAD UK
203017 Contrast Injectors & Rapid Infusors SPECTRIS SOLARIS EP MEDRAD UK
60243 (30212012) Contrast Injectors & Rapid Infusors SPECTRIS SOLARIS EP MEDRAD UK
62210 Contrast Injectors & Rapid Infusors SPECTRIS SOLARIS EP MEDRAD UK
200454 Contrast Injectors & Rapid Infusors STELLANT D MEDRAD UK
34115 Contrast Injectors & Rapid Infusors STELLANT D MEDRAD UK
200695 Contrast Injectors & Rapid Infusors STELLANT D MEDRAD UK
200807 Contrast Injectors & Rapid Infusors STELLANT D MEDRAD UK
200832 Contrast Injectors & Rapid Infusors STELLANT D MEDRAD UK
100210 Contrast Injectors & Rapid Infusors STELLANT D MEDRAD UK
200091 Contrast Injectors & Rapid Infusors STELLANT SX MEDRAD UK
200093 Contrast Injectors & Rapid Infusors STELLANT SX MEDRAD UK
5. Maintenance Requirements
Bidders must be able to maintain all the equipment listed.
Bidders are to provide quotations for the following maintenance options:
⢠Fully comprehensive (all planned service visits and breakdowns including parts).
⢠Planned maintenance visits (including all consumable parts) but not including reactive visits.
All engineers must be trained / accredited by the manufacturer.
All parts must be OEM and be new.
Bidders must state their response times for reactive callouts.
6. Terms and Conditions
Any contract will be subject to the NHS Purchase Order Terms and Conditions for the Provision of Services.
No supplier information available.