EKFB are looking for a competent contractor to install filter drains as part of the dewatering system within the temporary cutting for the Greatworth Green Tunnel.
The scope of works includes, but is not limited to:
⢠Installation of approximately 11,000m of 100mm in diameter perforated pipe at 3m to 4m depth and connect it to well point pumps.
⢠All works have to be done in a way to avoid people-plant interface as well as working within the trench.
⢠The works will not be continuous as the drainage works will have to be done in stages, following the Earthworks operations being undertaken.
Timeline
Start Date - March 2022
Location of the Works: G2S, Greatworth Green Tunnel, ch:101+978 to 104+838
Through this expression of interest you vetted in accordance with the EKFB prequalification model - for further information visit https://www.competefor.com/EiffageKier/
Upon successful shortlisting you will be invited to tender from the EKFB eSourcing platform Market Dojo
EKFB will be using a balanced scorecard approach to its procurement activities - for further information visit the above website