BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
NOTE: THIS IS A RE-OPENED OPPORTUNITY
IF YOU RESPONSED TO THE ORIGINAL ADVERT YOU DO NOT NEED TO RESPOND TO THIS ADVERT.
WP12.2.1 - HS2 Lift Steelwork & Glazing
Scope of Work:
The OOC Station HS2 Scenic Lifts Fit Out package consists of the primary steelwork and cladding to the OOC HS2 station scenic lifts and comprises of the following scope:
⢠Detailed design, supply and installation of primary steelwork and glazed cladding to 12 scenic + 3 interchange lifts in the HS2 station platforms and concourse area, including provision of brackets, supports and required service holes to interfacing contractors.
⢠Fully coordinated design with MEPH services, advertising, signage, station common components and lifts contractor, including design of brackets, supports and allowance for service holes.
⢠Provide RIBA 5 design and construction drawings including connection details, fabrication drawings, general arrangements, and elevation drawings for construction.
Additional information: No Documentation is included at this point.
No supplier information available.