BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The drainage channel at Strumpshaw Engine House provides the outflow for the pump which is required to be in working order. The brick and block channel is in a poor condition and has partially collapsed, being supported by sandbags at present.
The repair of the channel will be the first part of a wider package of works to extend the outflow pipe along the channel and over the headwall and backfill part of the channel (not included in this tender).
As well as repairing and rebuilding the structure, it will need to be increased in height slightly, buttressed at its western end and a headwall installed within it.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| GT ROCHESTER PLANT LIMITED | 04457659 | £30,000 | - |