Kettering General Hospital NHS Foundation Trust is looking for a contractor to visit the hospital review both Northfield House and Glebe House on a sites visit and to propose a simple scheme to replace the boilers.
The Trust may award the works in both buildings to one supplier or split the buildings between two separate contractors
Northfield House
We have reviewed the gas consumption which averages out at 32kw per hour, (32 kW is a peak at the coldest time of year, average is a lot less.) this being the case smaller boilers can be installed to suit.
Glebe House
We are looking for a more economical solution, as the heating system will be connected to the main heating circuit within next 3-4years.
What we require from the contractor going forwards is:
⢠Specification of works (to be proposed from site visit)
⢠Methodology of how they would proceed with the works.
⢠Schematic of proposed drawings.
⢠BMS controls to be left as currently installed.
⢠All redundant equipment to be removed from site.