BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
CTC is requiring a contractor to undertake repairs to the riverbank in Enfield Park, Camelford, Cornwall, due to bank erosion. This stretch of riverbank is approximately 70m in length. Some areas already have rock rolls in place (held in place with pins and rope in good order) and so require raising further with rock rolls/coir rolls. See detailed specification for details. A site visit is recommended.
In addition to this work, it also requires resurfacing work to the circular path from the "Waterfall Bridge". This path measures an approximate distance of 1km and is around 1400mm wide. It should be assumed that the sub-base is sufficient for resurfacing ( tarmac/grit can be placed on top). See detailed specification for details. A site visit is recommended.
No supplier information available.