Upgrade of the GT1 controls which are obsolete.
Design, manufacture, test and installation of new complete UCP (unit control panel) to replace the existing TCP/GCP (No "generator protection" is included) sections for the Centrax CX501 KB5 Generator.
Design, manufacture, test and installation of new fire system, including new bedplate CO2 nozzles/sounders/sensors and repeater panels. Installation to replace the existing fire system for the Centrax CX501 KB5 Generator set .
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Centrax gas turbines | 06029427 | £386,800 | - |