BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Maintenance dredge and disposal of area outside of Royal Quays Marina from lock to river channel.
Maximum volume of material to be dredged and disposed is 20,000m3.
Plant expected to be Self-propelled split hopper barges will be loaded by spud leg backhoe dredger.
Pre and post-dredge hydrographic surveys.
Additional information:
As soon as you express an interest, the tender documents become available to download. The direct link to the opportunity is: https://procontract.due-north.com/Advert?advertId=61256d54-fb5f-eb11-8106-005056b64545
No supplier information available.