Decarbonisation & Investment Installation Works Framework
The submission deadline passed on 11 Oct 2024, 10:00am.
Description
The Authority seeks to establish a multi-supplier Framework to provide Energy Efficiency Retrofit measures in accordance with PAS 2035, and traditional Investment and refurbishment works for domestic and public buildings for its Members and other Public Sector Contracting Bodies.
The scope of the framework includes (but is not limited to)
PV and Battery Storage; ASHP / GSHP; Insulation including EWI, IWI, CWI, Loft and floor; Windows & Doors; Ventilation; Roofing; Roofline & rainwater goods; Electrical Work; Boiler Replacement; Hot water / heat distribution systems; Kitchens; Bathrooms; Damp & Mould remediation; Internal Decoration; Plastering; Carpentry & joinery; Wall tiling & Boarding; Above & Below DPC pipework; Footpaths; Associated works; Pre & Post Installation Surveys and Tests; PAS 2035 Consultancy
The tender is split into ten regional lots
Lot 1 – North East
Lot 2 – Yorkshire & Humber
Lot 3 – North West
Lot 4 – West Midlands
Lot 5 – East Midlands
Lot 6 – East of England
Lot 7 – South East
Lot 8 – South West
Lot 9 – London
Lot 10 - Wales
The authority seeks to appoint up to 8 suitably qualified Principal Contractors per Lot able to provide the full requirements.
This procurement was divided into 10 lots, each awarded separately.
Lots
10
Lot
Value
Status
Lot 1
Lot 1 North East
1,800 days (≈4.9 yrs)
-
active
Lot 2
Lot 2 - Yorkshire & Humber
1,800 days (≈4.9 yrs)
-
active
Lot 3
Lot 3 - North West
1,800 days (≈4.9 yrs)
-
active
Lot 4
Lot 4 - West Midlands
1,800 days (≈4.9 yrs)
-
active
Lot 5
Lot 5 - East Midlands
1,800 days (≈4.9 yrs)
-
active
Lot 6
Lot 6 - East of England
1,800 days (≈4.9 yrs)
-
active
Lot 7
Lot 7 - South East
1,800 days (≈4.9 yrs)
-
active
Lot 8
Lot 8 - South West
1,800 days (≈4.9 yrs)
-
active
Lot 9
Lot 9 - London
1,800 days (≈4.9 yrs)
-
active
Lot 10
Lot 10 - Wales
1,800 days (≈4.9 yrs)
-
active
Key Dates
Published
13 September 2024
Tender Open
-
Tender Deadline
11 October 2024
Award Date
-
Contract Start
-
Contract End
-
Notice Amendments
Changes the buyer published to this notice after it first appeared.
Amendment 1
Change (I.3) Communication): The procurement documents are available for unrestricted and full direct access, free of charge, at
https://procontract.due-north.com/Procurer/Advert/View?advertId=1eedd272-6064-ef11-812e-005056b64545&fromAdvertEvent=True
Additional information can be obtained from the above-mentioned address
Tenders or requests to participate must be submitted electronically via
https://procontract.due-north.com/Procurer/Advert/View?advertId=1eedd272-6064-ef11-812e-005056b64545&fromAdvertEvent=True → The procurement documents are available for unrestricted and full direct access, free of charge, at
https://procontract.due-north.com/Advert?advertId=1eedd272-6064-ef11-812e-005056b64545
Additional information can be obtained from the above-mentioned address
Tenders or requests to participate must be submitted electronically via
https://procontract.due-north.com/Advert?advertId=1eedd272-6064-ef11-812e-005056b64545
Amendment 2
IV.2.2) Time limit for receipt of tenders or requests to participate (IV.2.2): 11 October 2024 → 18 October 2024
IV.2.7) Conditions for opening of tenders (IV.2.7): 11 October 2024 → 18 October 2024
I.3) Communication (1.3): The procurement documents are available for unrestricted and full direct access, free of
charge, at
https://procontract.due-north.com/Procurer/Advert/View?advertId=1eedd272-6064-ef11-81
2e-005056b64545&fromAdvertEvent=True
Additional information can be obtained from the above-mentioned address
Tenders or requests to participate must be submitted electronically via
https://procontract.due-north.com/Procurer/Advert/View?advertId=1eedd272-6064-ef11-81
2e-005056b64545&fromAdvertEvent=True → The procurement documents are available for unrestricted and full direct access, free of charge, at
https://procontract.due-north.com/Advert?advertId=1eedd272-6064-ef11-812e-005056b64545
Additional information can be obtained from the above-mentioned address.
Tenders or requests to participate must be submitted electronically via
https://procontract.due-north.com/Advert?advertId=1eedd272-6064-ef11-812e-005056b64545
Procurement Details
Method
Open — any supplier may bid
Method Details
Open procedure
Route to market
Framework set up
Main category
Works
Category
Electricity
Delivery location
UKC, UKE, UKD, UKG, UKF, UKH, UKJ, UKK, UKI, UKL
Open under
WTO Government Procurement Agreement
Buyer Reference
DN732251
Legal Basis
Public Contracts Regulations 2015 (EU Directive 2014/24)
CPV Codes
45300000 – Building installation work; 09310000 – Electricity; 09320000 – Steam, hot water and associated products; 09330000 – Solar energy; 44620000 – Central-heating radiators and boilers and parts; 45260000 – Roof works and other special trade construction works; 45400000 – Building completion work; 51110000 – Installation services of electrical equipment; 71240000 – Architectural, engineering and planning services; 71250000 – Architectural, engineering and surveying services