BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Cwm Taf Morgannwg University Health Board (CTMUHB) have awarded a Lead Consultant to undertake a comprehensive survey, assessment, and prioritised upgrade plan for the High Voltage (HV) and Low Voltage (LV) electrical infrastructure at the Princess of Wales Hospital, Bridgend.
The hospital's existing electrical infrastructure, dating from approximately 1985, contains several single points of failure across both HV and LV systems, including ageing switchgear, insufficient resilience, and limited standby generation capacity. The appointed consultant will be required to carry out a full technical survey of the HV/LV network, standby generators, and associated infrastructure; identify risk-critical defects; and develop high-level costed solutions aligned with Welsh Health Technical Memoranda (WHTM).
The Lead Consultant will act as Lead Designer to develop and deliver approved short-term works aimed at improving resilience and reducing the immediate risk of supply failure. Duties will include preparation of design specifications, contractor competence assessment, tender documentation, project management, contract administration, site supervision, and oversight of testing and commissioning. The scope covers pre-contract services through to completion and defects-period support.
The consultancy team is expected to include Electrical Engineering (lead), Architectural, Structural/Civil, Fire Engineering, Project Management, Cost Management, and CDM Principal Designer services.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Eta Projects | 03281860 | £30,780 | - | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately. 8 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Jan 2026 – Mar 2027 | £1 £30,780 initial term | 8 | ETA Projects | active |
Weightings from the notice.
Government spending data: This supplier has received £1,067,009 in 146 payments (over £25k) from Guy's and St Thomas' NHS FT, Maidstone and Tunbridge Wells NHS Trust (2023-01-06 to 2026-02-13). View full payment history →