BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The proposed works comprise the refurbishment and enhancement of the existing Shirley Ponds Skatepark through extensive groundworks, site regrading and reinforced concrete construction. A key feature of the scheme is the retention of the existing skate ramps and trick features, which will remain in situ and be utilised as permanent formwork for the new concrete skatepark. Rather than demolishing and removing the existing structures, reinforced concrete will be poured over and around them, encapsulating the current features and incorporating them into the structural fabric of the new facility. This innovative approach removes the need for demolition and disposal of the existing equipment, reducing both construction costs and environmental impact whilst retaining much of the existing skatepark footprint. The works also include excavation and levelling of the site, installation of geotextile membrane, imported fill and Type 1 sub-base materials, reinforced concrete slabs, edge details and associated concrete riding surfaces. Together, these works will deliver a durable, modern concrete skatepark that maximises the value of existing assets while providing a significantly improved facility for users.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| SCHOFIELD GROUNDWORKS LIMITED | 03464288 | £255,000 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £255,000 initial term | active |