The Trust has a new requirement to deliver a sustainability programme that combines two separate but intrinsically linked projects to achieve NHS Net Zero targets, improve resilience, and future-proof infrastructure. These projects are titled "Public Sector Decarbonisation" and "High Voltage Infrastructure". The purpose of this procurement is to procure a supplier to provide an M&E Engineer led multi-disciplinary design team to complete the design phase (RIBA stage 2) and provide technical advisory services to the main contractor through RIBA stages 3 to 7 for both projects.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| WSP UK LIMITED | - | £1,610,000 | - |